Home News The HUB at King George Station and Marine Gateway Achieve LEED® CS Gold
All News

The HUB at King George Station and Marine Gateway Achieve LEED® CS Gold

Congratulations to Triovest BC team and PCI Developments for achieving LEED® Core and Shell (CS) Gold at both the HUB at King George Station, in Surrey, and Marine Gateway, in Vancouver. Both buildings exemplify sustainable, mixed-use, transit-oriented development.

Marine Gateway Highlights:

  • Promotes alternative transportation by:
    • Combining direct transit integration of Marine Drive Canada Station and South Vancouver Bus Loop
    • Encouraging cycling with onsite bicycle storage
    • Providing Level 2 EV chargers
  • Reduces energy consumption by using an onsite closed loop geo-exchange system that shares heating, cooling, and domestic hot water between retail, office and residential uses, and providing capacity for future system expansion to meet neighbouring energy use
  • Provides a minimum of 70% of heating requirements from renewable energy and reduces greenhouse gasses up 60% compared to ‘business as usual’

 

The HUB at King George Station Phase A Highlights:

  • Encourages alternative transportation by providing onsite bicycle storage and shower facilities for occupants, providing ten public electric car charging stations and ten private Level 2 EV chargers, and direct access to adjacent SkyTrain transit
  • Collaborates with Coast Capital to deliver educational information sessions and engagement contests to employees to raise awareness of diverting waste from landfill, with results indicating a 75% diversion rate
  • Reduces energy consumption through installation of occupancy sensors for 70% of the connected lighting load
  • Uses green power to provide 70% of the building’s electricity and reduce greenhouse gas emissions
Share:

Other News

Triovest Wins Two Real Estate Sustainability Achievements at the 2023 LEAP Awards

Leveraging DE&I in Talent Management in Canadian Commercial Real Estate

MSCI/REALPAC Canada Property Index Reveals Modest Investment Returns

Harwood Business Park – Phase 1 Complete

10 King East and 83 Yonge Now Under Management

Canada offers real estate investors stable alternative in volatile environment

Triovest Achieves 4 Stars and Sector Leader

Triovest wins Crest Award for Innovative Excellence

Triovest wins Crest Award for Collaborative Excellence

Triovest @ ICSC Canada

Triovest Wins 2022 National Pinnacle Award

1 Prologis Boulevard at Mississauga Gateway Centre Receives BOMA BEST Gold Certification

2-8 Prologis Boulevard at Mississauga Gateway Centre Receives BOMA BEST Gold Certification

Blog: Canada’s demographic trends fuel stability for CRE investors

Blog: Making ESG goals a reality

9925 Building Team Wins Operations Team of the Year Award

Lululemon to Open Flagship Store at 2 Bloor W

Triovest Acquires Warehouse Facility in Mississauga

Blog: Investing in Canadian Commercial Real Estate

Triovest Joins FSB Task Force

4455 Rue Cousens Acquisition

Harwood Business Park Development